The chart at the top of a project page showed bars and nothing else. There was no scale, so a bar's height only told you how it compared to the busiest week. There was no way to tell which week a bar was. And on a project with a budget, nothing showed where the budget was.
It now has:
An hours axis. Bars are drawn against real hours with labelled gridlines, so you can read a value off the chart and compare one project to another.
Dates under the bars. Labels thin out as the range grows, but the first and last are always shown, so the span the chart covers is legible at a glance.
Details on hover. Point at a bar — or tab to it — and the line beneath reads the period and its exact hours. Bars are keyboard reachable, so the numbers are not mouse-only.
A weekly or monthly view. Monthly is the default on projects with a monthly budget, because that is the period the budget is set in.
A budget line. Projects whose budget resets each month get a dashed threshold across the monthly view, and any month over it is drawn in red. The hover detail turns into hours spent and hours remaining against that month's budget.
The month you are looking at is marked, so you can see which bar the tables below are describing — the chart still shows every month, because comparing them is the point of having one.
The current month is drawn striped and labelled "so far", since a month that is still filling up is not comparable to a finished one and a solid bar invites exactly that comparison.
Weeks and months with no time now appear as gaps rather than being skipped. A project that paused for two months used to draw its bars side by side, which read as continuous work.
One thing this does not do: a project with a fixed total budget, rather than one that resets monthly, still has no line. A single total does not divide into a month, and drawing it as though it did would invent a number nobody set.